LEED-新型建造项目管理-影印版
LEED-新型建造项目管理-影印版作者:耶拉姆拉什 开 本:16开 书号ISBN:9787560345079 定价:146.0 出版时间:2014-06-01 出版社:哈尔滨工业大学出版社 |
LEED-新型建造项目管理-影印版 内容简介
由耶拉姆拉什编著的《leed-新型建造项目管理(影印版)》介绍leed标准评估系统和leed标准新建筑工程积分分类、工程项目管理过程、项目定义和目标设定、设计阶段的整合、建筑工程阶段的贯彻、leed标准过程(可调性、可实施性及*优实践)、未来趋势、优势贯彻(可持续性场地;水的有效利用;能量和大气;材料和资源;室内环境质量;设计创新)。
LEED-新型建造项目管理-影印版 目录
forewordacknowledgments
part 1 process
chapter 1 introduction
from green to leed
the fundamentals of the leed rating system
leed-nc credit categories
impact of leed buildings
energy performance
financial returns
occupant productivity
co2 emissions reduction
what this book is about
what this book is not
why manage leed projects differently?
how to use this book
part 1: process
part 2: implementation
notes
chapter 2 leed project management process
introduction
process
the traditional architectural design process
the integrated design process
the gbci leed certification process
the leed project management process
people
project team
leed project team roles and responsibilities
planning
schedule
budget/costing leed
quality
notes
chapter 3 stage i: project definition and goal setting
introduction
step 1 : collect and compile preliminary data
activity 1.1- identify owner's project requirements
activity 1.2--collect preliminary site data
activity 1.3--gather preliminary project data
activity 1.4-- perform leed occupancy calculations
activity 1.5--create project team directory
activity 1.6--obtain preliminary project schedule
activity 1.7-- research green incentives
activity 1.8--compile all data
step 2: prepare a preliminary leed assessment
activity 2.1--review credit requirements to assess feasibility
activity 2.2-- identify potential implementation strategies
activity 2.3--identify next steps
activity 2.4--prepare a credit responsibility matrix
step 3: register the project on leed online
activity 3.1- register project on leed online
activity 3.2--assign credit responsibilities online
step 4: organize a leed vision workshop
activity 4.1--prepare workshop outline
activity 4.2--facilitate the workshop
step 5: prepare a leed project workbook
activity 5.1 --update preliminary documents
activity 5.2--prepare leed project workbook
summary
notes
chapter 4 stage ih design phase integration
introduction
schematic design (sd)
leed phase
sd leed phase
step 1: perform credit analyses
建筑 建筑科学
在线阅读
- 最新内容
- 相关内容
- 网友推荐
- 图文推荐
上一篇:土木工程制图-(第二版)
下一篇:既有建筑的绿色改造-影印版
零零教育社区:论坛热帖子
[家长教育] 孩子为什么会和父母感情疏离? (2019-07-14) |
[教师分享] 给远方姐姐的一封信 (2018-11-07) |
[教师分享] 伸缩门 (2018-11-07) |
[教师分享] 回家乡 (2018-11-07) |
[教师分享] 是风味也是人间 (2018-11-07) |
[教师分享] 一句格言的启示 (2018-11-07) |
[教师分享] 无规矩不成方圆 (2018-11-07) |
[教师分享] 第十届全国教育名家论坛有感(二) (2018-11-07) |
[教师分享] 贪玩的小狗 (2018-11-07) |
[教师分享] 未命名文章 (2018-11-07) |