海洋平台组装与浮托安装技术
海洋平台组装与浮托安装技术作者:Genshen Liu,Huajun L 开 本:25cm 书号ISBN:9787030512062 定价:198.0 出版时间:2017-01-01 出版社:科学出版社 |
海洋平台组装与浮托安装技术 目录
Contents1 Offshore Platform Topsides and Substructure 1
1.1 Platform Topsides 2
1.2 Design of Offshore Platform Topsides and Substructures 6
1.2.1 Topsides Design in General 6
1.2.2 Modular Topsides, Integrated Topsides and Single Lift Topsides 9
1.2.3 Jacket Design 21
1.3 Consideration of Construction and Integration of Topsides and Substructure 23
1.3.1 Platform Design Strongly Related to the Methodology of Platform Integration 23
1.3.2 Impact of Changing Integration Method 26
References 34
2 Platform Integration and Stationing 35
2.1 Self Installable Platform 36
2.1.1 Jack-Ups 36
2.1.2 SIP II Platform [9] 41
2.1.3 EDP [13–15] 48
2.2 Inshore Integration [16] 51
2.2.1 Inshore Topsides Integration by Heavy Lifting 54
2.2.2 Inshore Platform Integration by Floatover 58
2.2.3 Moving-in-Under [23–25] 65
2.3 Offshore Integration 71
2.3.1 Topsides Installation by HLCV [26, 27] 71
2.3.2 Offshore Topsides Installation by Floatover 76
2.3.3 Challenges and Development 82
2.4 Summary 84
References 85
3 Floatover Technology 87
3.1 Floatover Concept 87
3.2 Advantages of Floatover Method [7–10] 94
3.3 Category of Floatover Technology 98
References 99
4 HIDECK Floatover Technology 101
References 114
5 UNIDECK and SMARTLEG 115
5.1 UNIDECK Floatover 115
5.2 Comparison UNIDECK to HIDECK 116
5.3 UNIDECK Equipment and Operation 118
5.4 Advantages of UNIDECK Method Comparing
to the HIDECK Method 123
5.5 SMARTLEG Installation Method 125
5.6 Application of SMARTLEG Technology [9, 10] 127
References 129
6 Catamaran Floatover 131
6.1 Multi-vessel Floatover 131
6.2 “Catamaran Floatover” Origination 133
6.3 Catamaran Floatover Technology 137
6.3.1 General Discussion 137
6.3.2 Catamaran Floatover Categories 141
6.4 Technical Challenges 146
6.4.1 One Extra Operation Phase 146
6.4.2 Mating Operation 151
References 151
7 Project Management and Planning 153
7.1 Offshore Installation Projects 153
7.1.1 Features of T&I Projects 154
7.1.2 Project Team and Its Main Functions [5] 157
7.2 Project Management and Project Organizations 177
7.2.1 Project Management 177
7.2.2 Project Organizations and Organization Charts 178
7.3 PM (Project Manager) 180
7.4 PEP (Project Execution Plan) 182
7.5 IM (Installation Manual) 183
7.6 Summary Comments 188
References 189
8 Engineering Analysis and Model Test 191
8.1 Engineering Plays a Vital Role in Floatover Projects 191
8.1.1 Engineering Team on the Project 192
8.1.2 Engineers—Their Quality and Challenges 193
8.2 Categories of Engineering Work 195
8.2.1 Installation Criteria Set Up 195
8.2.2 Analysis and Simulation Supporting Operation Procedure Development 196
8.2.3 Floatover Equipment Design and Qualification 196
8.2.4 Emergency Handling 197
8.2.5 On-Site Supporting 197
8.2.6 Model Test 197
8.3 Engineering Work Quality Management 198
8.3.1 Analysis/Design Philosophy 198
8.3.2 DB 198
8.3.3 Analysis and Design Procedures 198
8.3.4 Involvement in the Early Stage of the Project 199
8.4 Analysis and Simulation Work 199
8.4.1 Stability Analysis 199
8.4.2 Transportation Motion Simulation and Hydrodynamic Load Calculation 200
8.4.3 Topsides Transfer Simulation and Catamaran System Transportation 202
8.4.4 Floatover Simulation [2–4] 204
8.5 Structural Analyses 210
8.5.1 Global Structural Analysis 210
8.5.2 Topsides Integrity Checking 211
8.6 Design Work [5] 212
8.6.1 DSS (DSF) Design 212
8.6.2 LMU [6] 216
8.7 Model Test for Transportation and Floatover Operation 220
8.7.1 Main Contents of Model Test Specification 220
8.7.2 Motion Decay Test 223
8.7.3 Transportation Model Test 223
8.7.4 Pre-mating Test 224
8.7.5 Mating Test 225
8.7.6 Model Test Results and the Data Evaluation [7–9] 226
8.8 Summary 227
References 228
9 Operation Execution 229
9.1 Installation Procedures and IFC Drawings 229
9.2 Platform Integration Operation Activities 231
9.3 Task Force Management 232
9.4 Loadout and Pre-sailaway 234
9.4.1 Preparations 235
9.4.2 Weather Broadcasting and Tide Survey 243
9.4.3 Loadout Operation 244
工业技术 石油、天然气工业
在线阅读
- 最新内容
- 相关内容
- 网友推荐
- 图文推荐
上一篇:大倾角煤层长壁综采理论与技术
下一篇:电机与电气控制技术项目式教程
零零教育社区:论坛热帖子
[家长教育] 孩子为什么会和父母感情疏离? (2019-07-14) |
[教师分享] 给远方姐姐的一封信 (2018-11-07) |
[教师分享] 伸缩门 (2018-11-07) |
[教师分享] 回家乡 (2018-11-07) |
[教师分享] 是风味也是人间 (2018-11-07) |
[教师分享] 一句格言的启示 (2018-11-07) |
[教师分享] 无规矩不成方圆 (2018-11-07) |
[教师分享] 第十届全国教育名家论坛有感(二) (2018-11-07) |
[教师分享] 贪玩的小狗 (2018-11-07) |
[教师分享] 未命名文章 (2018-11-07) |