工程管理专业英语

首页 > 图书 > 教育类图书/2020-06-16 / 加入收藏 / 阅读 [打印]
工程管理专业英语

工程管理专业英语

作者:王竹芳

开 本:16

书号ISBN:7301149573

定价:24.0

出版时间:2009-03-01

出版社:北京大学出版社

工程管理专业英语 内容简介

本书主要内容包括:项目管理组织、雇主、成本估算、项目预算、承包商、工程承包合同的类型、招标程序、项目融资、关键路径法、进度控制、创新和技术与经济的可行性等。

工程管理专业英语 目录

Unit1 Organizing for Project ManagementUnit2 The EmployerUnit3 Cost EstimationUnit4 The Project Budget(1)Unit5 The project Budget(2)——Forecasting for Activity Cost ControlUnit6 The ContractoUnit7 Types of Construction ContractsUnit8 Tendering Procedure(1)Unit9 Tendering Procedure(2)Unit10 Project FinanceUnit11 The Critical Path MethodUnit12 Schedule Contro(1)Unit13 Schedule Contro(2)Unit14 Innovation and Technological & Economic FeasibilityUnit15 Claims,Disputes and ArbitrationUnit16 Sample Forms of Securities参考文献

工程管理专业英语 节选

《工程管理专业英语》主要内容包括:项目管理组织;雇主;成本估算;承包商;工程承包合同的类型;招标程序;项目融资;关键路径法;进度控制;创新和技术与经济的可行性;索赔、争端和仲裁;各类保证范例格式等。《工程管理专业英语》选材广泛、内容新颖、针对性强、难度适中,有助于提高读者阅读相关专业的英语书刊和文献的能力,以获取专业信息和掌握学科发展动态。《工程管理专业英语》为高等院校工程管理专业本科学生学习专业英语而编写,亦可作为土木工程专业英语教材,同时也可供广大从事工程管理、土木工程,且具备一定英语基础的工程技术人员及自学者学习参考。

工程管理专业英语 相关资料

Construction cost estimates may be viewed from different perspectives because of different institutional requirements. In spite of the many types of cost estimates used at different stages of a project, cost estimates can best be classified into three major categories according to their functions. A construction cost estimate serves one of the three basic functions: design, bid and control. For establishing the financing of a project, either a design estimate or a bid estimate is used.Design EstimatesFor the owner or its designated design professionals, the types of cost estimates encountered run parallel with the planning and design as follows:(1) Screening estimates (or order of magnitude estimates).(2) Preliminary estimates (or conceptual estimates).(3) Detailed estimates (or definitive estimates).(4) Engineer's estimates based on plans and specifications.For each of these different estimates, the amount of design information available typically increases.In the planning and design stages of a project, various design estimates reflect the progress of the design. At the very early stage, the screening estimate or order of magnitude estimate is usually made before the facility is designed, and must therefore rely on the cost data of similar facilities built in the past. A preliminary estimate or conceptual estimate is based on the conceptual design of the facility at the state when the basic technologies for the design are known.The detailed estimate or definitive estimate is made when the scope of work is clearly defined and the detailed design is in progress so that the essential features of the facility are identifiable.The engineer's estimate is based on the completed plans and specifications when they are ready for the owner to solicit bids from construction contractors. In preparing these estimates, the design professional will include expected amounts for contractors' overhead and profits.The costs associated

工程管理专业英语

 1/2    1 2 下一页 尾页

外语 行业/职业英语 科技英语

在线阅读

  • 最新内容
  • 相关内容
  • 网友推荐
  • 图文推荐