海洋平台组装与浮托安装技术 |
|
2020-08-02 00:00:00 |
|
海洋平台组装与浮托安装技术 目录
Contents 1 Offshore Platform Topsides and Substructure 1 1.1 Platform Topsides 2 1.2 Design of Offshore Platform Topsides and Substructures 6 1.2.1 Topsides Design in General 6 1.2.2 Modular Topsides, Integrated Topsides and Single Lift Topsides 9 1.2.3 Jacket Design 21 1.3 Consideration of Construction and Integration of Topsides and Substructure 23 1.3.1 Platform Design Strongly Related to the Methodology of Platform Integration 23 1.3.2 Impact of Changing Integration Method 26 References 34 2 Platform Integration and Stationing 35 2.1 Self Installable Platform 36 2.1.1 Jack-Ups 36 2.1.2 SIP II Platform [9] 41 2.1.3 EDP [13–15] 48 2.2 Inshore Integration [16] 51 2.2.1 Inshore Topsides Integration by Heavy Lifting 54 2.2.2 Inshore Platform Integration by Floatover 58 2.2.3 Moving-in-Under [23–25] 65 2.3 Offshore Integration 71 2.3.1 Topsides Installation by HLCV [26, 27] 71 2.3.2 Offshore Topsides Installation by Floatover 76 2.3.3 Challenges and Development 82 2.4 Summary 84 References 85 3 Floatover Technology 87 3.1 Floatover Concept 87 3.2 Advantages of Floatover Method [7–10] 94 3.3 Category of Floatover Technology 98 References 99 4 HIDECK Floatover Technology 101 References 114 5 UNIDECK and SMARTLEG 115 5.1 UNIDECK Floatover 115 5.2 Comparison UNIDECK to HIDECK 116 5.3 UNIDECK Equipment and Operation 118 5.4 Advantages of UNIDECK Method Comparing to the HIDECK Method 123 5.5 SMARTLEG Installation Method 125 5.6 Application of SMARTLEG Technology [9, 10] 127 References 129 6 Catamaran Floatover 131 6.1 Multi-vessel Floatover 131 6.2 “Catamaran Floatover” Origination 133 6.3 Catamaran Floatover Technology 137 6.3.1 General Discussion 137 6.3.2 Catamaran Floatover Categories 141 6.4 Technical Challenges 146 6.4.1 One Extra Operation Phase 146 6.4.2 Mating Operation 151 References 151 7 Project Management and Planning 153 7.1 Offshore Installation Projects 153 7.1.1 Features of T&I Projects 154 7.1.2 Project Team and Its Main Functions [5] 157 7.2 Project Management and Project Organizations 177 7.2.1 Project Management 177 7.2.2 Project Organizations and Organization Charts 178 7.3 PM (Project Manager) 180 7.4 PEP (Project Execution Plan) 182 7.5 IM (Installation Manual) 183 7.6 Summary Comments 188 References 189 8 Engineering Analysis and Model Test 191 8.1 Engineering Plays a Vital Role in Floatover Projects 191 8.1.1 Engineering Team on the Project 192 8.1.2 Engineers—Their Quality and Challenges 193 8.2 Categories of Engineering Work 195 8.2.1 Installation Criteria Set Up 195 8.2.2 Analysis and Simulation Supporting Operation Procedure Development 196 8.2.3 Floatover Equipment Design and Qualification 196 8.2.4 Emergency Handling 197 8.2.5 On-Site Supporting 197 8.2.6 Model Test 197 8.3 Engineering Work Quality Management 198 8.3.1 Analysis/Design Philosophy 198 8.3.2 DB 198 8.3.3 Analysis and Design Procedures 198 8.3.4 Involvement in the Early Stage of the Project 199 8.4 Analysis and Simulation Work 199 8.4.1 Stability Analysis 199 8.4.2 Transportation Motion Simulation and Hydrodynamic Load Calculation 200 8.4.3 Topsides Transfer Simulation and Catamaran System Transportation 202 8.4.4 Floatover Simulation [2–4] 204 8.5 Structural Analyses 210 8.5.1 Global Structural Analysis 210 8.5.2 Topsides Integrity Checking 211 8.6 Design Work [5] 212 8.6.1 DSS (DSF) Design 212 8.6.2 LMU [6] 216 8.7 Model Test for Transportation and Floatover Operation 220 8.7.1 Main Contents of Model Test Specification 220 8.7.2 Motion Decay Test 223 8.7.3 Transportation Model Test 223 8.7.4 Pre-mating Test 224 8.7.5 Mating Test 225 8.7.6 Model Test Results and the Data Evaluation [7–9] 226 8.8 Summary 227 References 228 9 Operation Execution 229 9.1 Installation Procedures and IFC Drawings 229 9.2 Platform Integration Operation Activities 231 9.3 Task Force Management 232 9.4 Loadout and Pre-sailaway 234 9.4.1 Preparations 235 9.4.2 Weather Broadcasting and Tide Survey 243 9.4.3 Loadout Operation 244 9.4.4 Post Loadout and Pre-sailaway Preparation 249 9.5 Topsides Installation 250 9.5.1 Field Preparation 251 9.5.2 Stand-by Stage Activities 253 9.5.3 Pre-docking Stage Activities 254 9.5.4 Docking Stage 255 9.5.5 Pre-mating Stage 256 9.5.6 Mating Stage 257 9.5.7 Undocking/Withdrawal Stage 259 9.6 Post-installation Operation 259 9.6.1 In-field Activities 260 9.6.2 Vessel Demobilization Preparation 260 9.7 Mating Operation Contingency Procedure 260 9.8 Summary 261 References 262 10 Evolution and New Source of Motivation 263 10.1 Retrospect of the Application of Floatover Technology 263 10.2 Evolution 266 10.3 Concept Derived from Conventional Floa
|
|
http://book.00-edu.com/tushu/kj1/202008/2672313.html |